Messages
Choose a project to open its conversation.
Adjuster confirmed for Thursday at 9. Can someone be on site to walk the slopes with him?
I will be there. Bringing the drone shots and the ridge measurements.
Delivery is scheduled for 7am Friday. 42 squares of Duration in Onyx Black plus ridge cap and starter.
Dumpster drops Thursday afternoon so it is out of the way for the adjuster.
Homeowner asked if we can protect the rose beds along the east side. Tarps and plywood should do it.
Core samples show two layers of modified bitumen over a wet fiberboard. Recommending a full tear-off on the north section.
Agreed. Let us price both the patch and the tear-off so the property manager can decide.
Proposal is drafted with both options. Sending it to you for review before it goes out.
Board approved the 6 inch seamless gutters in Musket Brown for all 12 buildings.
Great. I will book the gutter machine for the week of the 22nd and line up two crews.
Please add downspout extensions to the order. Three of the buildings drain toward the sidewalks.
Sounds good, I will take care of it.
Copy that. I will update the schedule and let the crew know.
Thanks. I will follow up with the homeowner this afternoon.
Got it. Adding that to the material order now.
@You yes, I saw that. I will have the paperwork ready before the adjuster arrives.
@You thanks for flagging it. I will call the homeowner and confirm this afternoon.
@You on it. The crew will be there at 7 sharp with the materials.
@You I checked the order and everything is accounted for. Nothing missing.
Nice, that photo is exactly what the adjuster needs. Adding it to the file.
Got the attachment. I will pass it along to the crew lead.